
PROJECTS
Our projects aim to strike a balance between the commercial efficiency of technology use, resource consumption, and effectiveness. That is why the best specialists have created one-of-a-kind tools for unique and effective solutions. The projects on which Undereslab has worked are listed below.

High-Specific-Surface-Area Packing for Chemical & Petrochemical Industries
Mass transfer processes are essential in the chemical and petrochemical industries for separating, purifying, and reacting different chemical components. These processes rely on efficient phase contact between gases and liquids or between immiscible liquid phases to achieve optimal separation



Projects in which Undereslab team members were involved
Companies from China, India, Israel, USA, Canada, Australia, Kazakhstan, Egypt and other countries,
ZTMK (UA), UKTMP (KZ), Pangang Group International Economic & Trading Co., Ltd, Yunnan Metallurgical Xinli Titanium Industry Co., Ltd (CHINA).
Contracts for project development, know-how sale, and engineering services for the development of technologies and equipment for the production of titanium slag, titanium tetrachloride, titanium sponge, magnesium, rare metals, stainless steels and cast iron, ferroalloys.
ZTMK LLC, ZALK LLC, Zaporizhzhya Non-Ferrous Metals Plant LLC, Ust-Kamenogorsk Titanium and Magnesium Plant JSC (UKTMP), JSC UMCC
Fulfillment of direct economic contracts for the modernization and re-equipment of metallurgical and chemical enterprises.
PE "Viza-Service", Zaporizhzhya
Workshop for the production of parts from titanium powders. Project, Working documentation.
Saraf Agencies Pvt. Ltd, Republic of India
Design and engineering work on the development of an individual lining design, as well as technical services for lining installation and commissioning of electric arc furnaces No. 2 and No. 4 for smelting titanium slag at the company's production site.
Song Binh Minerals Join Stock Company, Socialist Republic of Vietnam
Transfer of technology for the organization and operation of production lines for the industrial production of pigment titanium dioxide by the sulfuric acid method.
Central Iron Ore Enrichment Works (CGOK), Kryvyi Rih
Development of a feasibility study, technical documentation for the technology, and the primary technological equipment for the project of reconstruction of the pelletizing plant's treatment facilities.
JSC “UKTMP”, The Republic of Kazakhstan
Design documentation (drawings) for a hydrojet installation are provided.
JSC “UKTMP”, The Republic of Kazakhstan
Increasing the extraction of vanadium in the processing of pulp residues by reducing the loss of vanadium.
JSC “UKTMP”, The Republic of Kazakhstan
Determination of the causes of the separation of magnesium and magnesium chloride during the recovery process, as well as the formation of a TG block during the recovery of an irregular (filled) shape. Determine the causes of the increased titanium impurity content in magnesium chloride. Optimization of the recovery process's technological modes in accordance with the current design of the operating apparatuses, raw materials, and reagents used. Making changes to the technological regime and issuing recommendations to prevent the separation of magnesium and magnesium chloride, the output of TG blocks of irregular (filled) shape.
PCC SE, Germany
Development of technology and experimental equipment for the chlorination of metallurgical silicon to produce silicon tetrachloride.
PCC SE, Germany
Development of technology for the production of silicon nanopowders from silicon tetrachloride.
Ministry of Industrial Policy of Ukraine
Development of the technology of magneithermal production of spongy zirconium for the needs of nuclear energy.
"Zirconium of Ukraine" - State target economic program "Nuclear Fuel of Ukraine"
Targeted comprehensive scientific research program of NAS of Ukraine "Scientific support of nuclear energy complex and perspective nuclear technologies".